The lab app is re-baselined onto testing once, after its stage is sealed
After the fifty-stream stage is sealed
(BL-U4), the lab’s
app is re-baselined onto the current testing ONCE, with real three-way
merges and its generated files rebuilt by harness sync
(UR-02); the package
split is done in the same window.